White Night is in experimental operation - May 21, 2006
![]()
Here is where construction is done. The hour of power approaches. The wires are stripped X-ray 125KV 20A. Good stuff. You can see them laid out on the concrete. The ballast, pig, variac, and controller can all be seen inside the workspace.

![]()
Excellent result. Pulling around 55A @ 220V.

![]()
Is it Christmas or is this symmetry real?
.
![]()
Run for the hills!

![]()
Patrick enjoys the scenery.

![]()